Home About OBEC News Careers Contact Us Bidding Info FTP
BridgeRoadwayStructuralMarineEnvironmentalPlanningSurveyInspection

Division Manager:

541.683.6090


Download Permitting BrochurePermitting brochure

Download Wetlands BrochureWetland services brochure

Download Biological Assessment BrochureBiological Assessment services brochure

Download Fish Salvage BrochureFish Salvage brochure

Download Fish Passage BrochureFish Passage brochure

Download Project Scoping & Analysis BrochureScoping & Analysis brochure

Download Construction Compliance BrochureConstruction Compliance brochure


OBEC's services include a multi-disciplinary team of environmental specialists that can provide complete natural resource, environmental, permitting, and land use assistance.

OBEC's team of dedicated environmental staff works directly with design engineers, client staff, subconsultants, and regulatory and resource agencies to ensure that each project fully complies with all applicable laws and regulations.

By completing environmental studies and integrating compliance early in the design process, we routinely identify solutions that avoid or minimize impacts while maximizing the potential for natural resource enhancement. This approach helps clients explore project designs that are sensitive to the environment and have the potential to improve aesthetics, landscape, and community.

OBEC provides professional project management services that produce results. We understand the importance of execution and believe that delivering a superior quality product on-time and within budget are the factors that will determine success.

Examples of the environmental studies, permits, and documentation that OBEC regularly completes includes:

  • Site scoping and analysis
  • Wetland and waters delineations
  • Wetland functional assessments
  • Mitigation plans and monitoring reports
  • USACE/DSL Joint Permit Applications
  • SLOPES compliance reports
  • ESA No Effect Memorandums
  • Biological Assessments
  • Local land use permits
  • Section 4(f) and Section 6(f) compliance
  • DEQ NPDES 1200-C Applications
  • DEQ Section 401 Certification
  • Erosion and sediment control plans  
  • Temporary water management plans
  • Scientific take permits (fish salvage)
  • In-water work period extension requests
  • Railroad crossing orders
  • NEPA categorical exclusion documentation