White Salmon River Bridge - Time-Lapse
OBEC Consulting Engineers and Mowat Construction worked with Williams Pipeline to replace a pipeline exposed after the decommissioning of the Condit Dam. Because limited site access prevented the use of cranes, crews used a trolley and cable system to set the girders.
View more videos
OBEC welcomes new environmental specialist
OBEC is pleased to announce that Andy Burke has joined our Environmental / Permitting team as an environmental specialist! Keep reading to learn more about Andy: Read more >
OBEC secures #1 spot on Oregon Department of Transportation engineering consultant list
ODOT this week announced the results of its architecture and engineering full-service engineering consultant selection, and OBEC Consulting Engineers was awarded the top ranking among a highly competitive pool of 19 proposers.
Read more >
Oregon City Arch Bridge to receive prestigious award at International Bridge Conference
The rehabilitation of the historic Oregon City Arch Bridge is set to receive the first-ever Abba G. Lichtenstein Medal at the 2013 International Bridge Conference. The award is meant to honor "outstanding achievement in bridge engineering demonstrating artistic merit and innovation in the restoration and rehabilitation of bridges of historic or engineering significance."
Read more >