Skip to content
Projects

Jane Sanders Softball Stadium Survey

OBEC provided construction staking for the University of Oregon Women’s Softball Stadium. The project was fast-tracked with high accuracy standards. OBEC provided quality control and review of another survey firm’s horizontal and vertical controls and benchmarks, then based all survey markers on those benchmarks. The construction staking survey included foundations, footings, retaining walls, field lighting, fencing, the seating structure, all buildings, and all items associated with the playing field.

Services Provided

Surveying
  • Jane Sanders Stadium was built on the location previously occupied by Howe Field, which was built as a baseball field in 1936 and converted to a softball field in 1980.
arrow