Description

• Pigment plant required to meet discharge requirements for the

outfall stream as mandated by the Mexican Government agency

CONAGUA (CNA).

• Convert the disposal of a metal chloride waste stream,

generated with low-grade ore chlorination, to a neutral brine

solution and metal hydroxide through installation of new

neutralization and filtration facilities.



Scope of Work

• New filter building and presses

• New lime facility

• Neutralization tank farm

• ICR / ECR buildings

• New pipe rack and existing upgrades


Challenges

• Schedule – slip not an option

• Multicultural project team


Keys to Success

• Integrated project team

• Common / clear objectives