Absorber and Dewatering Piping Project – Electric Utility Company - Alabama | Estimated TIC: $15 MM
Description • Ammonium Sulfate Gas Desulfurization System for Sanders Lead Project Scope of Work • AutoCAD 3D Piping and Design Support...
2 views


Kyle Miller
2 days ago1 min read
Steel Mill Expansion – Industrial Gases Company - Ohio | Estimated TIC: $24 MM
Description • Design of Liquid Nitrogen (LIN) and Liquid Oxygen (LOX) and Liquid Argon (LAR) facilities owned by Air Products to supply...
0 views


Kyle Miller
2 days ago1 min read
Wax Pilot Plant Relocation - Energy and Industrial Company - Texas | Estimated TIC: $7.5MM
Description • Scoping and Detailed Design for a multi-discipline project to relocate the Wax Pilot Plant from NJ to TX. Scope of Work •...
0 views


Kyle Miller
2 days ago1 min read
29-H-8 Heater Project - Refinery - Delaware | Estimated TIC: $100 MM
Description • 29-H-8 horizontal cabin style re-boiler furnace was damaged due to fire in 1980’s. The furnace was installed in 1956 as...
0 views


Kyle Miller
2 days ago1 min read
Hydrogen Generator Skid Project – Industrial Gases Company - Pennsyvania | Estimated TIC: $4.5 MM
Description • 3D AutoCAD Design of hydrogen generator skid Scope of Work • Piping Isometrics with Bills of Materials that allowed for...
0 views


Kyle Miller
2 days ago1 min read
Nylon Project – Chemical and Fibers Company - Turkey | Estimated TIC: $65 MM
Description • New industrial nylon yarn facility for tire core. • Facility part of a vertically integrated tire production complex. Scope...
0 views


Kyle Miller
2 days ago1 min read
Cyclone Dust Mitigation Project – Energy and Industrial Company - Missouri | Estimated TIC: $1.5 MM
Description • Project to mitigate the risk of a dust deflagration. • New jacketed cyclones, new blowers and explosion venting, and...
0 views


Kyle Miller
2 days ago1 min read
Supplemental Boilers Project - Refinery - Delaware | Estimated TIC: $4 MM
Description • Installation of four 75,000 lb./hr., 750 psi / 750oF steam boilers and deaerator Scope of Work • Engineering and design for...
0 views


Kyle Miller
2 days ago1 min read
Sodium Ascorbate Project – Bioscience Company - New Jersey | Estimated TIC: $4 MM
Description • Design and installation of a system to mill sodium ascorbate • Mill, surge hoppers and fluid bed granulator • Streamline...
0 views


Kyle Miller
2 days ago1 min read
Pilot Plant Project Relocation – Food Company - New Jersey | Estimated TIC: $3.5 MM
Description • Relocation of pilot plant from Plainfield, NJ to Bridgewater, NJ • Design and specification for new equipment • PFD’s,...
0 views


Kyle Miller
2 days ago1 min read
Gas Compression Project – Energy Company - Delaware | Estimated TIC: $2.8 MM
Description • Increase capacity of gas compression plant by 50% • Execute Upgrades During Limited Shut Down Scope of Work • Replace all...
1 view


Kyle Miller
2 days ago1 min read
WWTP Optimization – Asphalt Refinery - New Jersey | Estimated TIC: $9 MM
Description • Upgrade existing wastewater treatment plant to treat increased levels of organics and ammonia in wastewater from a change...
0 views


Kyle Miller
2 days ago1 min read
Plant Services Upgrades – Chocolate Company - Hawaii | Estimated TIC: $1.5 MM
Description • Determine upgrades for recently acquired nut processing facility • Purchased electricity expensive, site generation (steam)...
2 views


Kyle Miller
3 days ago1 min read
Arsine Production Facility – Electronics Company Pennsylvania | Estimated TIC: $42 MM
Description • Greenfield Arsine Production facility adjacent to existing operating plant; still in construction with target startup in...
0 views


Kyle Miller
3 days ago1 min read
Rail Yard Mechanical Facilities - New York | Estimated TIC: $70 MM
Description • New mechanical facilities at our Client's SSY. • 30,000 sf office/shop. • 40,0000 sf specialty warehouse. • Boiler house. •...
0 views


Kyle Miller
3 days ago1 min read
Pre- Polymer Expansion – Chemical Company - New Jersey | Estimated TIC: $30 MM
Description Brownfield Pre-Polymer Facility adjacent to existing operating plant Scope of Work • Front-end load based on similar facility...
1 view


Kyle Miller
3 days ago1 min read
Neutralization Project – Chemical Manufacturing Company - Mexico | Estimated TIC: $27 MM
Description • Pigment plant required to meet discharge requirements for the outfall stream as mandated by the Mexican Government agency...
0 views


Kyle Miller
3 days ago1 min read
SPCC Containment - Refinery - New Jersey | Estimated TIC: $9.7 MM
Description • Upgrades to 78 containment areas over a 200-acre site • Federal SPCC compliance • NJ DPCC compliance • Construction...
0 views


Kyle Miller
3 days ago1 min read
Polymer Modified Asphalt - Refinery New Jersey | Estimated TIC: $5 MM
Description • Developed the Front-End Loading (conceptual design) and the process basis of design (BOD) for the construction of a new...
0 views


Kyle Miller
3 days ago1 min read
Scrubber BOP Piping Project – Electric Utility Company - North Dakota | Estimated TIC: $50 MM
Description • Flue gas desulfurization system at the Minnkota Power Cooperative. Scope of Work • BOP for a flue gas desulfurization...