Supplemental Boilers Project - Refinery - Delaware | Estimated TIC: $4 MM

Writer: Kyle MillerKyle Miller

Updated: Mar 4

Description

• Installation of four 75,000 lb./hr., 750 psi / 750oF steam boilers and deaerator



Scope of Work

• Engineering and design for all disciplines

• Pipe sizing, routing, tie-ins, stress analysis and supports

• Structural supports, platforms, foundations and detailed lifting plans

• Electrical load study, MCC sizing, tray and conduit routing

• Instrumentation specifications and control interface

• Construction support


Challenges

• Compressed schedule - design to start-up < 4 months

• Design-build


Keys to Success

• Strong home office support and team coordination

• Interface with construction contractors and equipment vendors