• Installation of four 75,000 lb./hr., 750 psi / 750oF steam boilers and deaerator

Scope of Work
• Engineering and design for all disciplines
• Pipe sizing, routing, tie-ins, stress analysis and supports
• Structural supports, platforms, foundations and detailed lifting plans
• Electrical load study, MCC sizing, tray and conduit routing
• Instrumentation specifications and control interface
• Construction support
Challenges
• Compressed schedule - design to start-up < 4 months
• Design-build
Keys to Success
• Strong home office support and team coordination
• Interface with construction contractors and equipment vendors